Planningvia Cornwall Council Planning
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -...
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ
Address: Shelton Farm Delabole Cornwall PL33 9DA
Ref: PA26/04833
Type: Overhead Electricity Lines
Status: Awaiting decision
Ward: St Teath And Tintagel